Renovating a villa in Bali: what to fix before the first booking

A tired villa in Bali is sold at a discount for the state of the building, and that discount is only real if the scope of work is known. Buyers who price a renovation from photographs usually end up paying for a roof, a pool plant and a new electrical panel out of the first year of rental revenue. The order below is the one that keeps a renovation from turning into a rebuild: survey first, then split the scope, then settle the approvals, then control the contractor, then accept the building and hand it to management.

If the purchase is still open, the Bali villas for sale due-diligence checklist covers the legal side and the Bali villa investment guide explains how the numbers are framed. This page starts later, at the point where the building is yours and the work has to be described in quantities rather than adjectives.

Survey the building before anyone agrees a scope

A renovation budget written at a first viewing is a guess. Before a contractor is asked for a price, the building needs a condition survey with photographs and measurements, room by room. Five groups of items do most of the work.

The survey is also where the documents are read against the building. Approved drawings rarely match a villa that has been extended twice, and every mismatch is either a small correction or a permit question. The PBG and SLF due-diligence checklist sets out what to compare and in what order.

Split the scope into three buckets

Renovations go wrong when cosmetics, systems and structure are discussed as one number. Three buckets make the priorities visible, and they are not equal in either cost or risk.

BucketWhat belongs thereWhy the order matters
SystemsElectrical panel and circuits, plumbing, water treatment, air conditioning, pool plant, internet and access controlWalls and floors hide them. Every system replaced later means opening finished surfaces again
Structure and layoutRoof, columns and beams, new openings, added bedrooms, extended living space, terracesChanges the footprint and the approved drawings, so it raises the permit question before work starts
CosmeticsPaint, tiles, furniture, soft furnishings, lighting, garden and stylingThe visible part, the easiest to redo, and the one buyers want to start with

The practical rule is to spend the first pass on what cannot be reached later: roof, waterproofing, services and pool. A villa with new paint over a failing roof is a villa that will be renovated twice. Cosmetic choices can also wait for the market evidence: rates in the area, the guest profile and what the comparable villas around it actually offer.

Approvals: cosmetic work, changes, and PBG

Indonesian building approval is built around the PBG, the building permit for constructing, changing, extending, reducing or maintaining a building, under Government Regulation No. 16 of 2021 and administered through the SIMBG system. Maintenance and a cosmetic refresh normally stay inside the existing approval. Moving walls, adding a bedroom, changing the roof form or building an extension is a change to the building, and a change is exactly what the PBG framework is written for. The question is answered with the local building office before demolition, not after it.

The second document is the SLF, the certificate stating that a completed building is fit for use. Government Regulation No. 28 of 2025 requires the SLF before a building is used and provides an assessment route for existing buildings, which matters when a renovation alters function, capacity or the way the building is serviced. If the villa is going to be rented to guests, the operating file sits on top of both: the business classification under OSS, the entity that holds it, and the address it is tied to.

Zoning belongs in the same pass. Bali Provincial Regulation No. 2 of 2023 sets the provincial spatial plan for 2023 to 2043, with detail at regency level, and a dwelling that was acceptable as a private house may follow a different path once it is rebuilt for guests. Adding a bedroom is a construction decision and a licensing decision at the same time, and the two are cheaper to reconcile on paper.

The contract that keeps a renovation inside its budget

A lump sum per square metre is the format that produces the most arguments, because it prices a scope nobody has measured. Six clauses do most of the work.

  1. A bill of quantities. Work described room by room and system by system, with quantities, so a change can be priced against a line rather than negotiated from zero.
  2. Payment against accepted work. Milestones tied to inspection, not to calendar dates, with a retention held back until the snag list is closed.
  3. Who buys materials. Either the contractor with receipts attached to every claim, or the owner with a storage and site security plan. Mixed arrangements are where quality quietly drops.
  4. A written change procedure. No instruction without a written price and a schedule effect. The work that appears after signature is the most expensive work on the site.
  5. Reporting and supervision. Weekly photographs, a site log, and an independent supervisor if the owner is not on the island. Somebody has to be able to say no.
  6. The documents at completion. As-built drawings, equipment manuals and warranties, supplier and service contacts, and a schedule of what was replaced.

Two local realities deserve a line in the contract. Access matters: narrow lanes and shared driveways decide how materials arrive and how quickly a crew works. And a crew that is shared across several sites moves slower than a dedicated one, whatever the schedule says.

Season, lead times and the opening date

Bali's rainy season runs roughly from November to March. External work slows in that window: roof cover, pool shell and deck, rendering, exterior paint and landscaping all become weather-dependent, while internal work continues. A renovation that starts in December and promises a June opening has very little room left.

The calendar also sets the commercial deadline. Occupancy in Bali is seasonal: a well-run villa can sit in the low 90s percent in July and fall into the 40s in February, which is why an opening date matters more than a completion date. Imported finishes and custom joinery are ordered before demolition, not after the walls come down, and a buffer belongs in the plan for the two or three items that will be late.

Acceptance: the snag list and the file that stays with the building

Acceptance is a process, not a signature. Walk the villa room by room with the snag list open and photographs for every defect, then set a defects period during which the contractor returns at their own cost. Systems are accepted by test, not by eye: plumbing held under pressure, drainage that flows, insulation and earthing measured, air conditioning commissioned in each room, pool circulation and water quality checked, and hot water and pumps run for long enough to fail if they are going to.

Then assemble the operating file: approved drawings and the current PBG and SLF documents, as-built changes, the equipment list with warranties, the service schedule for pool, pumps, air conditioning and pest control, and a simple register of what was replaced and when. That file is the difference between an asset that can be maintained and one that is rediscovered by every new contractor, and it is the first thing an engineer will ask for when the villa is next valued or sold.

Handing the finished villa to management

The gap between completion and the first booking is where renovation gains leak away. Before the villa goes live, the operating team needs the inventory, the warranty list, the service schedule and the approved photographs, plus a decision on what the villa is being sold as: a family house, a couple's retreat or a group villa. That decision changes the furniture, the sleeping configuration and the pricing, and it is much cheaper to make before the last delivery than after the first reviews.

The villa management page describes how the operating side is organised once the building is ready. The first month is also the right moment to check that the licence, the listing and the way the villa is actually used still match.

What a renovation changes in the investment case

Renovation moves two numbers: the rate a villa can ask and the share of the year it is occupied. Both depend on the fit between the finished product and demand in that specific area, which is why comparisons belong inside one neighbourhood rather than across the island. A villa rebuilt to a standard the area does not support will not earn back the difference, and a villa rebuilt below the standard of its street will simply be discounted.

Two constraints frame the whole calculation. The remaining lease term has to be longer than the payback period you are modelling, because a lease does not extend itself. And the money spent on structure and systems earns differently from money spent on furniture, which depreciates faster than a roof. The Bali villa investment guide sets out how return bands and exit risk are framed for villas on the island.